Anhui PVC Pipeline Project

PROJECT OVERVIEW

This is a centralized feeding system project for PVC pipes. We signed the contract in November 2025 and completed the installation in January 2026.The scope of supply included in this quotation encompasses raw material loading and storage, metering and conveying, extruder feeding, PLC control system, as well as wire and cable, debugging, and technical services.

Design basis

a. System configuration requirements proposed by the buyer.

b. Production capacity requirements proposed by the buyer.

c. The supplier’s proprietary supporting technology (successful performance in similar systems).

d. Guaranteed supply capability of imported components.

e. Guarantee capability of domestic components and specialized devices.

System Configuration

a. Raw material feeding and storage: 2 sets (provided by the user)

b. Main material metering and conveying system: 2 sets

c. Manual feeding of auxiliary materials:2 sets

d. Hybrid unit: 2 sets (provided by the user)

e. Extruder feeding: 3 sets

f. Computer control system:1 set

The control system adopts both manual and automatic control, which not only ensures convenient operation but also reduces the labor intensity of employees, making it practical and reliable.

3. System performance, electricity consumption, and compressed air consumption

a. Total system output (assuming a packing density of 0.6-0.7): approximately 1800-2000kg/h.

b. Total power: around 235KWc. Compressed air consumption: 40 cubic meters per minute.   