In September 2020, our company successfully designed and implemented a centralized feeding system for Anhui Keju. The system is designed to improve the efficiency of raw material transport, production stability, workshop automation, and environmental standards. This system is customized based on Keju’s actual production processes and workshop layout, ensuring reliable operation and easy management.
System Configuration
The centralized feeding system includes raw material (PVC, CaCO3, wood powder) metering, conveying, mixing, storage, extruder feeding, PLC computer control system, as well as conveying pipelines, electrical wires and cables, commissioning, and technical services. The main components are:
- Raw material silos
- PVC, CaCO3, wood powder metering scales
- Mixing units
- Finished material conveying and storage silos
- Ribbon mixer (secondary mixing)
- Extruder feeding
The control system supports both manual and automatic control, ensuring ease of operation while reducing worker labor intensity. It is practical and reliable.
All parts in contact with the material are made of high-quality stainless steel to ensure cleanliness and prevent contamination.
Process Flow Description
After centralized storage of raw materials, the system automatically conveys the materials to various production equipment based on preset parameters. The system can precisely control the transport time and material usage, effectively reducing manual handling and material waste. Through the central control system, operators can monitor the equipment’s operating status in real time and conveniently adjust operational parameters.
System Performance and Power & Compressed Air Consumption
a. Total system output (bulk density at 0.6-0.7): Approximately 10,000 kg/h.
b. Total system power: Approximately 2200 kW.
c. Compressed air consumption: Approximately 10 m³/min.
Project Results
After the system was put into operation, it ran steadily at the Anhui Keju site, effectively improving overall production efficiency, reducing worker labor intensity, and optimizing workshop management. The project has received unanimous praise from the client.







